-
date: 15 Apr 2019
We worked in with the architect, project manager, builder and other trades on-site to execute this full house renovation.
We installed new gas to the property, new gas water heating system (Rinnai Infinity), gas central heating system (Brivis Buffalo), storm-water soak pit, storm and sewer drainage, new kitchen, laundry, ensuite, and updated the toilet and vanity fixtures in the main bathroom.
![kitchen 1](https://ovp.co.nz/wp-content/uploads/2019/03/kitchen-1-1.jpg)